Fast, cost-effective replacement of a decommissioned Lichtblick CHP unit in Berlin-Biesdorf.
Project overview
Following the complete decommissioning of all Lichtblick CHP units in Germany, the condominium association in Berlin-Biesdorf also faced the question of how to replace its system quickly and cost-effectively.
The new plant had to meet the high energy requirements of the EnEV and a KfW programme used by the project. Kraftland was commissioned to provide specialist CHP design and managed the energy contracting tender, including construction supervision.
Design:
- On-site survey of existing systems
- Definition of requirements and developed design, including a hydraulic concept based on the parameters established
- Assessment of the installation location and flue concept, including noise issues, and design of the electrical system and feed-in management
- Design of a new, highly efficient CHP unit with the best possible utilisation
- Ensuring the new heat generators meet EnEV 2012 and KfW70 requirements
- Applications and enquiries to BAFA (incentive programme), gas and electricity grid operators
- Design with tendering support: obtaining comparable quotations to deliver the planned energy contracting project
- Arranging an energy contractor offering more attractive terms for the condominium association
Project:
- Installation of the new boiler system
- Provision of the new CHP unit with 20 kW electrical output
- Installation of the new heating system without interrupting supply
- Construction and connection of a customer network as part of the change from full feed-in to surplus feed-in
- Coordination and monitoring of project progress
- Commissioning by certified technicians from a manufacturer’s premium partner