Commercial
Brauhaus in Spandau
Modernisation of the heat and electricity supply for a brewery and hotel using a CHP solution.
Project overview
The brewing process creates consistently high hot water demand. The hotel operated on site by the owners also needs substantial heat and electricity. Adding a CHP unit proved a sensible, cost-saving measure when modernising the energy supply.
Design:
- Recording and evaluating the property’s specific data
- Project analysis of the feasibility and economic use of CHP technology
- Heating system design and sizing based on the assessed demand
- Design and sizing of ancillary systems: gas connection and electrical integration
Project:
- Provision of an EC Power CHP unit (XRGI with 9 kW electrical output)
- Hydraulic integration of the unit
- Installation of a buffer tank
- Subsequent replacement of the old peak-load boiler with a latest-generation high-efficiency model
Service
- Certified CHP commissioning
- Handling all registration formalities: BAFA, customs office and electricity grid operator
- Coordination of all project disciplines
- Initial application for energy tax reimbursement