Skip to main content
Heat supply for MOTORWORLD Manufaktur Berlin
All projects

Commercial & industrial

Berlin-Spandau

MOTORWORLD Manufaktur Berlin – Pellet heating supply

Design and implementation of a new heat supply with a 500 kW pellet system and adaptation of the existing local heat network.

Services & project data

Scope of services

  • Design of a sustainable heat supply system
  • 500 kW pellet boiler
  • Conversion and restructuring of the heat network
  • Implementation support

Project data

Service
Heat supply design
Plant technology
500 kW pellet system
HOAI
Service phases 1–8
Building services construction cost
Approx. €320,000

Starting point

In the first construction phase, the gas-based heat generation was to be replaced and the commercial site’s existing local heat network adapted. The new plant had to be integrated into the existing infrastructure.

Design services

Kraftland designed the separation and restructuring of the existing heat network, integration of a 500 kW pellet system and connection of the buildings to the new supply system. Technical support was provided during implementation.

Outcome

The existing gas-based supply was replaced by pellet-based heat generation. The adapted heat network supplies the connected buildings with heat.

Get in touch

Your project starts with a conversation.

Briefly describe your project. We will get back to you personally.

+49 30 417 24 488 info@kraftland.de

We use your details to respond to your enquiry. For more information, please see our Privacy Policy.