Single-family & apartment buildings
Max-Steinke-Straße condominium association: Lichtblick system conversion
Restructuring the central CHP and local heat supply for five single-family and two apartment buildings.
Project overview
The property at Max-Steinke-Straße in Berlin-Weißensee, where five single-family and two apartment buildings were supplied with heat by a central Lichtblick CHP unit and local heat network, was among the many properties affected by the nationwide decommissioning of Lichtblick CHP units.
Because KfW loans had been used, the challenge was to redesign the single-source generation plant as a redundant supply using CHP and a peak-load boiler, while still meeting all energy requirements under EnEV, EEWärmeG and KfW.
As engineer, Kraftland took responsibility for design, tendering and delivery. The condominium association’s objective was a new system with greater supply reliability at unchanged costs.
An energy contracting tender sought a heat supplier with similar terms for the plant conversion, allowing the association to complete the conversion without additional costs.
Design:
- Baseline survey and assessment of the plant and supply network
- Comparison of different CHP supply scenarios as part of a financial forecast
- Technical project analysis to define the heat generation plant
- Consideration and delivery of individual client requirements: checking all existing supply lines to reduce noise emissions
- Preparation of a specification to obtain quotations from specialist firms
- Energy contracting tender and bid evaluation
Project:
- Installation and certified commissioning of a CHP unit with 20 kW electrical output plus a peak-load boiler
- Flue design and acceptance for two heat generators
- Improved noise control measures
- Hydraulic balancing of the heat network
- Project support and construction management