{"id":290,"date":"2026-09-17T21:47:39","date_gmt":"2026-09-17T19:47:39","guid":{"rendered":"https:\/\/hosting172824.ae87f.netcup.net\/referenzen\/weg-apollofalterallee-berlin-biesdorf"},"modified":"2026-11-11T16:48:15","modified_gmt":"2026-11-11T15:48:15","slug":"away-apollofalterallee-berlin-biesdorf","status":"publish","type":"kraftland_reference","link":"https:\/\/www.kraftland.de\/en\/referenzen\/weg-apollofalterallee-berlin-biesdorf","title":{"rendered":"WEG Apollofalterallee \u2013 CHP replacement"},"content":{"rendered":"<h2>Project overview<\/h2>\n<p>Following the complete decommissioning of all Lichtblick CHP units in Germany, the condominium association in Berlin-Biesdorf also faced the question of how to replace its system quickly and cost-effectively.<\/p>\n<p>The new plant had to meet the high energy requirements of the EnEV and a KfW programme used by the project. Kraftland was commissioned to provide specialist CHP design and managed the energy contracting tender, including construction supervision.<\/p>\n<h2>Design:<\/h2>\n<ul>\n<li>On-site survey of existing systems<\/li>\n<li>Definition of requirements and developed design, including a hydraulic concept based on the parameters established<\/li>\n<li>Assessment of the installation location and flue concept, including noise issues, and design of the electrical system and feed-in management<\/li>\n<li>Design of a new, highly efficient CHP unit with the best possible utilisation<\/li>\n<li>Ensuring the new heat generators meet EnEV 2012 and KfW70 requirements<\/li>\n<li>Applications and enquiries to BAFA (incentive programme), gas and electricity grid operators<\/li>\n<li>Design with tendering support: obtaining comparable quotations to deliver the planned energy contracting project<\/li>\n<li>Arranging an energy contractor offering more attractive terms for the condominium association<\/li>\n<\/ul>\n<h2>Project:<\/h2>\n<ul>\n<li>Installation of the new boiler system<\/li>\n<li>Provision of the new CHP unit with 20 kW electrical output<\/li>\n<li>Installation of the new heating system without interrupting supply<\/li>\n<li>Construction and connection of a customer network as part of the change from full feed-in to surplus feed-in<\/li>\n<li>Coordination and monitoring of project progress<\/li>\n<li>Commissioning by certified technicians from a manufacturer\u2019s premium partner<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Fast, cost-effective replacement of a decommissioned Lichtblick CHP unit in Berlin-Biesdorf.<\/p>","protected":false},"featured_media":247,"menu_order":26,"template":"","class_list":["post-290","kraftland_reference","type-kraftland_reference","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference"}],"about":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/types\/kraftland_reference"}],"version-history":[{"count":2,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/290\/revisions"}],"predecessor-version":[{"id":607,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/290\/revisions\/607"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media\/247"}],"wp:attachment":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media?parent=290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}