{"id":294,"date":"2026-09-17T21:47:39","date_gmt":"2026-09-17T19:47:39","guid":{"rendered":"https:\/\/hosting172824.ae87f.netcup.net\/referenzen\/baeckerei-johann-mayer"},"modified":"2026-11-11T16:48:43","modified_gmt":"2026-11-11T15:48:43","slug":"baeckerei-johann-mayer","status":"publish","type":"kraftland_reference","link":"https:\/\/www.kraftland.de\/en\/referenzen\/baeckerei-johann-mayer","title":{"rendered":"B\u00e4ckerei Johann Mayer \u2013 CHP &amp; operations management"},"content":{"rendered":"<h2>Project overview<\/h2>\n<p>The long-established Berlin business faced comprehensive modernisation of the energy supply at its main premises. KRAFTLAND was responsible for the entire new heating system design and coordinated the various trades during construction, from the heating contractor and electrical installer to the chimney sweep. After successful commissioning, the client entrusted KRAFTLAND with administrative management of the CHP system.<\/p>\n<h2>Design:<\/h2>\n<ul>\n<li>Modernisation funding from KfW and BAFA<\/li>\n<li>Technical project analysis of feasibility and financial effects<\/li>\n<li>Advice on self-managed CHP operation and commercial heat supply<\/li>\n<li>Provision of contract templates for commercial heat supply<\/li>\n<li>Preparation of technical design for procurement from specialist companies<\/li>\n<\/ul>\n<h2>Project:<\/h2>\n<ul>\n<li>Combining two former heating systems into a modern CHP system comprising a CHP unit (15 kW electrical) and peak-load boiler<\/li>\n<li>Smooth equipment installation despite severely restricted space<\/li>\n<li>Electricity generated used almost entirely in the bakery\u2019s production processes<\/li>\n<li>Significant reduction in the company\u2019s energy costs<\/li>\n<li>Consistently high bakery energy demand ensures high plant utilisation<\/li>\n<li>Hydraulic balancing and subsequent restructuring of heat delivery: supplying rented units in the adjoining residential building<\/li>\n<\/ul>\n<h2>Service<\/h2>\n<ul>\n<li>A KRAFTLAND service contract covers operational management: utility notifications, reimbursement applications and operating behaviour checks<\/li>\n<li>Implementation of an energy contracting project to supply heat to the connected residential building: contract management and metering concept<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Heating system design and administrative management of a Berlin bakery\u2019s CHP system.<\/p>","protected":false},"featured_media":250,"menu_order":29,"template":"","class_list":["post-294","kraftland_reference","type-kraftland_reference","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/294","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference"}],"about":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/types\/kraftland_reference"}],"version-history":[{"count":2,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/294\/revisions"}],"predecessor-version":[{"id":611,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/294\/revisions\/611"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media\/250"}],"wp:attachment":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media?parent=294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}