{"id":295,"date":"2026-09-17T21:47:40","date_gmt":"2026-09-17T19:47:40","guid":{"rendered":"https:\/\/hosting172824.ae87f.netcup.net\/referenzen\/puk-group-gmbh-co-kg"},"modified":"2026-11-11T16:48:44","modified_gmt":"2026-11-11T15:48:44","slug":"puk-group-gmbh-co-kg","status":"publish","type":"kraftland_reference","link":"https:\/\/www.kraftland.de\/en\/referenzen\/puk-group-gmbh-co-kg","title":{"rendered":"PUK Group \u2013 Energy centre"},"content":{"rendered":"<h2>Project overview<\/h2>\n<p>PUK Group GmbH &amp; Co. KG is a long-established, independent private Berlin company. A leading manufacturer of cable support systems in Germany and Europe, it is known worldwide. Kraftland GmbH led the concept and installation of PUK Group\u2019s new energy generation centre.<\/p>\n<h2>Design:<\/h2>\n<ul>\n<li>Objectives: combine sustainable energy supply and environmentally conscious production with high efficiency and cost-effectiveness<\/li>\n<li>Analysis and assessment of actual heat demand scenarios<\/li>\n<li>Determining load behaviour<\/li>\n<li>Conversion of the energy supply fuel from oil to gas<\/li>\n<li>Development of a boiler replacement concept<\/li>\n<li>Design of hydraulic integration for the new generation plant<\/li>\n<li>Development of an emergency power concept<\/li>\n<li>Design of a metering and control concept for one or more CHP units and the distribution network connecting all consumer substations<\/li>\n<li>Coordination of BAFA funding applications<\/li>\n<li>Assessment of the gas connection<\/li>\n<li>Assessment of integrating adsorption chillers for production machinery cooling in a second expansion phase<\/li>\n<\/ul>\n<h2>Project:<\/h2>\n<ul>\n<li>Viessmann CHP unit (Vitobloc 200 EM) with 238 kW electrical output provides the heating base load during the heating season and domestic hot water<\/li>\n<li>CHP unit also used as a standby emergency power supply<\/li>\n<li>Vitorond peak-load boiler with 950 kW output covers peak heat demand during the heating season<\/li>\n<li>Plant designed for future expansion<\/li>\n<\/ul>\n<h2>Service<\/h2>\n<ul>\n<li>Coordination of extensive application and registration processes required by the unit\u2019s output class<\/li>\n<li>Operational management support, such as the initial energy tax reimbursement application and monitoring operating behaviour during start-up<\/li>\n<li>Application for connection to the low-voltage grid<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Concept and installation of a new energy generation centre for a Berlin production site.<\/p>","protected":false},"featured_media":251,"menu_order":30,"template":"","class_list":["post-295","kraftland_reference","type-kraftland_reference","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference"}],"about":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/types\/kraftland_reference"}],"version-history":[{"count":2,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/295\/revisions"}],"predecessor-version":[{"id":612,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/295\/revisions\/612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media\/251"}],"wp:attachment":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media?parent=295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}