{"id":32,"date":"2026-08-31T17:07:37","date_gmt":"2026-08-31T15:07:37","guid":{"rendered":"https:\/\/hosting172824.ae87f.netcup.net\/referenzen\/das-papillon"},"modified":"2026-11-11T16:47:40","modified_gmt":"2026-11-11T15:47:40","slug":"papillon-tga-planning","status":"publish","type":"kraftland_reference","link":"https:\/\/www.kraftland.de\/en\/referenzen\/papillon-tga-planung","title":{"rendered":"DAS PAPILLON \u2013 MEP design for hospitality"},"content":{"rendered":"<h2>Services &amp; project data<\/h2>\n<p data-pm-slice=\"1 1 []\">The technical equipment of restaurants, bars and event spaces places particular demands on planning. Different areas of use, changing visitor numbers and high requirements for the room climate, lighting and technical infrastructure all require careful coordination between all the trades involved.<\/p>\n<p>The company took over the concept for a catering and event venue in the Berlin City West area. <strong><a href=\"https:\/\/www.kraftland.de\/en\/\">Kraftland GmbH<\/a> the cross-industry TGA planning<\/strong>. The focus was on developing a technically-based infrastructure tailored to the needs of the facility, as well as integrating the systems into the architectural and interior design concept.<\/p>\n<h3>Scope of services<\/h3>\n<ul>\n<li><strong>Ventilation planning for catering and events:<\/strong> Planning and dimensioning of ventilation technology taking into account different areas of use, occupancy levels and requirements regarding the quality of indoor air.<\/li>\n<li><strong>Electric and lighting infrastructure:<\/strong> Planning of the electrical supply and technical infrastructure for catering operations, lighting and event technology.<\/li>\n<li><strong>Sanitary planning:<\/strong> Planning of sanitary facilities and drainage systems taking into account the functional requirements of the catering and event management industry.<\/li>\n<li><strong>Heating and cooling:<\/strong> Development and design of suitable systems for heating and cooling the various rooms and areas of use.<\/li>\n<li><strong>Cross-sectoral coordination:<\/strong> Coordination of the technical systems with the architecture, interior design and expansion planning to ensure functional integration.<\/li>\n<\/ul>\n<h3>Project data<\/h3>\n<div>PerformanceCross-sectoral TGA planning<\/div>\n<div>UseRestaurant, Bar and Event<\/div>\n<div>IndustriesHLSK and Electrical Engineering<\/div>\n<div>LocationBerlin City West<\/div>\n<h2>Starting point<\/h2>\n<div style=\"width: 622px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/cdn.sanity.io\/images\/9bpdgv86\/production\/9e0aed0ae52b4c1fb075988af971b720f80b451e-6000x4000.jpg\" alt=\"TGA planning Pappilon Berlin \" width=\"612\" height=\"408\" \/><p class=\"wp-caption-text\">\u00a9 Papillon Berlin<\/p><\/div>\n<p data-pm-slice=\"1 1 []\">The planning of the technical equipment for catering and event spaces requires a particularly close coordination between the different usage requirements and the existing building structure.<\/p>\n<p>Restaurant and bar areas place different requirements on ventilation, cooling, lighting and electrical power than event spaces. In particular, changing numbers of people, different operating times and the technical equipment of the individual areas must already be taken into account during the planning phase.<\/p>\n<p>An additional challenge was to integrate the necessary technical systems into the specified interior design. Ventilation ducts, electrical installations, sanitary supply systems, as well as heating and cooling technology had to be coordinated so that both the functional requirements and the overall architectural concept were taken into account.<\/p>\n<p>The goal was to develop a coordinated overall technical concept that supports the various uses while simultaneously enabling efficient and reliable building operation.<\/p>\n<h2>Design services<\/h2>\n<p data-pm-slice=\"1 1 []\">The Kraftland GmbH took over the holistic management of the <a href=\"https:\/\/www.kraftland.de\/en\/tga-planning\/\"><strong>MEP design<\/strong><\/a> the trades of heating, ventilation, plumbing, air conditioning and electrical engineering.<\/p>\n<p>An essential component of the planning was the coordination of the technical systems to meet the different requirements of the catering and event areas. This included, in particular, the design of the ventilation and air conditioning technology, the planning of the electrical infrastructure, and the integration of the sanitary and heating systems.<\/p>\n<p>The ventilation planning took into account the respective usage conditions and requirements regarding the air quality in the rooms. The heating and cooling technology was adapted to the different thermal requirements of the rooms in order to create suitable conditions for guests and staff.<\/p>\n<p>In parallel, the electrical supply was planned, including the infrastructure for lighting and the planned technical equipment.<\/p>\n<p>Special importance was attached to the cross-industry coordination with architecture and interior design. Through early coordination, the required installation areas and technical interfaces could be taken into account in the planning and aligned with the design concept.<\/p>\n<h2>Outcome<\/h2>\n<p data-pm-slice=\"1 1 []\">As a result, an <strong>coordinated planning of the technical building equipment<\/strong>, which takes into account the different operating requirements of restaurants, bars and event spaces.<\/p>\n<p>The technical systems for ventilation, heating, cooling, plumbing and electrical engineering were dimensioned in accordance with the respective usage requirements and integrated into the interior design plan.<\/p>\n<p>Through cross-industry coordination, a foundation was created for the implementation of the technical systems, in which functionality, technical requirements, and architectural design are considered together.<\/p>\n<p>The project illustrates the importance of holistic TGA planning for sophisticated catering and event concepts where different technical systems must reliably work together in a confined space.<\/p>\n<p><a href=\"https:\/\/www.papillon-berlin.com\/de\" target=\"_blank\" rel=\"noopener\">View the project<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Multi-disciplinary building services design for a combined restaurant, bar and event venue in Berlin-Charlottenburg.<\/p>","protected":false},"featured_media":237,"menu_order":1,"template":"","class_list":["post-32","kraftland_reference","type-kraftland_reference","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/32","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference"}],"about":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/types\/kraftland_reference"}],"version-history":[{"count":10,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/32\/revisions"}],"predecessor-version":[{"id":594,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/32\/revisions\/594"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media\/237"}],"wp:attachment":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media?parent=32"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}