{"id":536,"date":"2026-10-26T17:48:56","date_gmt":"2026-10-26T16:48:56","guid":{"rendered":"https:\/\/www.kraftland.de\/?post_type=kraftland_reference&#038;p=536"},"modified":"2026-11-11T16:48:49","modified_gmt":"2026-11-11T15:48:49","slug":"weilburgstrasse","status":"publish","type":"kraftland_reference","link":"https:\/\/www.kraftland.de\/en\/referenzen\/weilburgstrasse","title":{"rendered":"Weilburgstra\u00dfe \u2013 Energy concept for a daycare centre"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Services &amp; project data<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Scope of services<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Analysis of the existing heating system and energy consumption data<\/li>\n\n\n\n<li>Development and comparison of five energy supply options<\/li>\n\n\n\n<li>Technical and economic assessment of gas heating, an air source heat pump and photovoltaics<\/li>\n\n\n\n<li>Cost-benefit analysis over 10 and 20 years<\/li>\n\n\n\n<li>Assessment of investment costs, operating costs and CO\u2082 emissions<\/li>\n\n\n\n<li>Consideration of funding opportunities and on-site consumption of solar electricity<\/li>\n\n\n\n<li>Subsequent tendering and implementation support<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Project data<\/h3>\n\n\n\n<dl>\n<div>\n<dt>Service<\/dt>\n<dd>Energy concept and cost-benefit analysis<\/dd>\n<\/div>\n<div>\n<dt>Location<\/dt>\n<dd>Berlin<\/dd>\n<\/div>\n<div>\n<dt>Building use<\/dt>\n<dd>Daycare centre<\/dd>\n<\/div>\n<div>\n<dt>Existing system<\/dt>\n<dd>Gas heating<\/dd>\n<\/div>\n<div>\n<dt>Plant technology<\/dt>\n<dd>Gas boiler, air source heat pump and photovoltaics<\/dd>\n<\/div>\n<div>\n<dt>Comparison of options<\/dt>\n<dd>5 energy supply concepts<\/dd>\n<\/div>\n<div>\n<dt>Assessment period<\/dt>\n<dd>10 and 20 years<\/dd>\n<\/div>\n<div>\n<dt>Additional services<\/dt>\n<dd>Tendering and implementation support<\/dd>\n<\/div>\n<\/dl>\n\n\n\n<h2 class=\"wp-block-heading\">Starting point<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The future energy supply for an existing daycare centre in Berlin required a technical and economic assessment. The central question was whether to continue operating the existing gas heating system, replace it or supplement it with renewable energy sources. Both long-term operating costs and CO\u2082 emissions had to be taken into account.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Design services<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Kraftland analysed the existing building services and energy consumption data and developed five energy supply options. These included continued operation of the existing gas heating system, boiler replacement and hybrid solutions combining an air-to-water heat pump with photovoltaic systems of different sizes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Investment, energy and maintenance costs were calculated for each option, with cost-benefit analyses covering 10 and 20 years. The assessment also considered primary energy demand, CO\u2082 emissions, funding assumptions and potential savings from on-site consumption of solar electricity and revenue from electricity fed into the grid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Outcome<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The comparison showed that combining a gas boiler, an air-to-water heat pump and an appropriately sized photovoltaic system can offer significant economic and energy benefits. Compared with the existing supply system, the model indicated potential savings of around <strong>42%<\/strong> <strong>in annual net operating costs<\/strong> and a <strong>reduction in CO\u2082 emissions of approximately 35 <\/strong>%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The study provided a sound basis for deciding how to modernise the energy supply. Kraftland was subsequently commissioned to carry out tendering and support implementation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Energy concept and cost-benefit analysis for a daycare centre<\/p>","protected":false},"featured_media":540,"menu_order":0,"template":"","class_list":["post-536","kraftland_reference","type-kraftland_reference","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference"}],"about":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/types\/kraftland_reference"}],"version-history":[{"count":4,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/536\/revisions"}],"predecessor-version":[{"id":616,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/kraftland_reference\/536\/revisions\/616"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media\/540"}],"wp:attachment":[{"href":"https:\/\/www.kraftland.de\/en\/wp-json\/wp\/v2\/media?parent=536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}